전문적인 솔루션 제공

Reverse Osmosis on Ships: Design, Sizing, OPEX and Acceptance Guide

목차

reverse osmosis ship system installed in engine room – marine RO

Modern vessels increasingly choose a reverse osmosis ship solution to produce reliable freshwater with lower energy, faster start/stop, and a compact footprint compared with thermal evaporators. This guide distills engineering practices we use in marine RO projects—from process design and sizing to OPEX maths, maintenance, and acceptance—so you can make purchase decisions with confidence.

Reverse Osmosis Ship — Operating Window & Energy Math

RO separates salts through a semi-permeable membrane at high pressure; there is no phase change or boiler load. For many cargo, OSV, trawler, ferry/Ro-Ro, patrol, and expedition vessels, RO can replace the evaporator entirely or provide N+1 redundancy.

reverse osmosis ship system installed in engine room – marine RO
reverse osmosis ship system installed in engine room – marine RO
AspectEvaporatorShipboard RO
Energy & engine-room heatHigh; depends on waste heat3.5–5.5 kWh/m³ typical net specific energy
Start/stopSlow, thermal inertiaFast (minutes), flexible duty
발자국Larger, ancillariesCompact skid; modular trains
MaintenanceDescaling, boiling-outCartridge filters, antiscalant, periodic CIP
Water quality controlLimited real-time controlContinuous conductivity & ΔP monitoring

Process & P&ID—How Shipboard RO Works

The standard train is: seawater intake → pre-filtration → HP pump → RO membranes → permeate tank → remineralization/disinfection → distribution. Online sensors track conductivity, temperature, flow and differential pressure (ΔP). Auto-flush minimizes fouling after shutdown; lay-up preserves membranes during off-season.

shipboard reverse osmosis process – membranes, control panel, seawater piping
shipboard reverse osmosis process – membranes, control panel, seawater piping

Sizing for Crew, Route & Duty Cycle

Start from daily consumption per person and add hotel/galley load and a safety reserve. Use parallel skids (N+1) where uptime is critical or intake quality varies.

  • Daily consumption: 80–120 L/person/day (crew + hotel)
  • Reserve: 15–30% for weather/port stays
  • Temperature derating: colder seawater lowers permeate flow at a fixed pressure

Worked example — 30 crew, mixed routes

Base need: 30 × 100 = 3,000 L/day. Add 25% reserve ⇒ 3,750 L/day ≈ 3.8 m³/day. Select a 5–10 m³/d unit to allow derating in winter and provide margin for maintenance windows.

Prefer a ready-to-install option? See our product page: Marine RO 20 m³/d.

Operating Window & Energy Math

Use the following rule-of-thumb for permeate-side specific energy (ignoring minor losses); validate final numbers with your pump curve and ERD selection.

E (kWh/m³) ≈ 0.0278 × ΔPeff (bar) ÷ (ηpump × R)

ΔPeff = discharge pressure minus suction; ηpump = pump efficiency (0–1); R = recovery (permeate/feed).

marine RO pump with anti-vibration mounts
marine RO pump with anti-vibration mounts
매개변수Typical range (SWRO)What to watch
Feed TDS & temp25–40 g/L @ 5–30 °CCold water lowers flux; adjust recovery & pressure
Recovery (R)30–45%Too high → scaling/ΔP rise
Net ΔP55–70 bar (SW)Track pump kW and stage ΔP; fouling increases E
ERD (if used)η 0.8–0.95Couple LE elements with an efficient ERD

Marine-Grade Materials & Protection

  • Wetted parts: 316L standard; duplex 2205/2507 for harsher routes and warm, saline water
  • Pressure vessels: SWRO 8040/4040 with marine-grade clamps and supports
  • Electrical: IP54/55 enclosure, cable glands, E-stop, alarms and event logs
  • Anti-vibration: mounts under skid; flexible couplings at pump nozzles
  • Coatings: epoxy/PU marine coating on frames where applicable
  • Labelled interfaces: Seawater / Brine / Permeate / CIP for safe operation

Related components:

Typical BOM & Options

ModuleStandardOptions
Prefiltration5 µm cartridge guard filterMMF/UF, automatic strainers
HP pumpSS316 pump, fixed speedDuplex materials, VFD, energy-recovery device
Membranes8040 SWRO (LE/HR)4040 format for small skids
ControlsPLC + HMI, auto flushRemote monitoring, data logging, lay-up auto-routine
Post-treatmentRemineralization, UVChlorination, carbon polish for taste

Maintenance, CIP & Spare Strategy

  • Routine: cartridge change, antiscalant dosing check, ΔP trending, conductivity tracking
  • CIP triggers: rising ΔP, declining permeate flow, increased conductivity at constant setpoints
  • Typical cadence: CIP every 3–6 months depending on intake and duty; membrane life 3–5 years
  • Spare kit: cartridges, O-rings, pump service kit, antiscalant, preservation chemicals

Troubleshooting at Sea

SymptomLikely causesActions
ΔP rising fastFouling/scaling, clogged cartridgeReplace cartridge, check SDI & antiscalant; schedule CIP
Permeate flow dropsCold water, fouling, pump issueAdjust setpoints, verify pump curve, CIP if ΔP high
Conductivity spikesSeal leak, O-ring damage, bypassInspect vessels & seals, pressure test, swap O-rings
Frequent shutdown alarmsIntake swings, sensor driftStabilize intake, recalibrate sensors, review alarm limits

Case Snapshot—OSV Retrofit (20 m³/d)

An offshore support vessel replaced a thermal evaporator with a 20 m³/d RO skid. After commissioning, logs showed a ~18% reduction in kWh/m³ versus baseline and improved water quality stability. The operator adopted a ΔP-based CIP trigger and quarterly cartridge changes, reducing unplanned maintenance.

Potable-Water Safety & Records

Re-mineralization and disinfection (UV/chlorination) are standard. Keep commissioning records and test logs with your class documentation. Reference potable-water limits using recognized guidance such as the WHO drinking-water guidelines.

Procurement & Acceptance Checklist (Download)

Use this checklist for RFP, FAT/SAT and handover. Download the editable Excel and attach it to your vessel’s CMMS: Marine RO Acceptance Checklist (XLSX)

Need an implementation-ready unit? See: COVNA STARK Marine RO 20 m³/d.

Payback & Energy Savings Model

Energy dominates OPEX for seawater RO. Use this quick comparison to estimate annual savings against a thermal evaporator. Validate with your pump curve, ERD selection and local energy prices before purchase decisions.

ItemSymbolExample
Daily permeateQ20 m³/day
Specific energy (RO)E_ro4.5 kWh/m³
Specific energy (evaporator)E_evap8–12 kWh/m³ (equivalent)
Energy priceC_e0.16 USD/kWh
Annual operationh330 days × 24 h

Annual energy cost (RO) ≈ Q × E_ro × C_e × 24 × 330 = 20 × 4.5 × 0.16 × 7920 ≈ $11,404
Annual energy cost (Evaporator) (with 9 kWh/m³ equiv.) ≈ $22,809
Indicative annual saving$11,400. Higher ERD efficiency or VFD optimization can further improve savings.

Note: This is an engineering approximation. It ignores potable water quality differences, boiler efficiency and auxiliary loads. Use detailed sizing for procurement decisions.

FAT & SAT Acceptance Steps

  1. Documentation check: GA, P&ID, IOM, nozzle list, nameplate parameters, material declarations.
  2. Cold test: PLC/HMI I/O, alarms and interlocks; auto-flush and lay-up routines verified.
  3. Hydro test: Pressurize to 1.1–1.3× rated pressure; check for leaks and abnormal differential pressure.
  4. Performance test: Record feed/permeate flows, conductivity, pump power, recovery and specific energy.
  5. SAT onboard: Connect to seawater intake/brine/permeate; verify vibration mounts, noise level and ship power compatibility.
  6. Handover: Deliver spares list, maintenance plan, CIP recipes and commissioning logs; train crew.

Download the editable checklist (XLSX) and attach it to your CMMS: Marine RO Acceptance Checklist

자주 묻는 질문

What capacity do I need for a 20–40 crew vessel?
Plan for 80–120 L/person/day plus 15–30% reserve. Use N+1 trains where uptime is critical.
Can a reverse osmosis ship system fully replace an evaporator?
Yes for most routes. RO delivers lower energy and faster start/stop; keep backup capacity for CIP windows.
How often should we run CIP at sea?
Every 3–6 months in typical service; trigger earlier with ΔP and SDI trends.
Which materials are recommended for corrosion resistance?
316L is the baseline; choose duplex 2205/2507 for harsher, warmer and more saline conditions.
How should we lay up the unit during off-season?
Flush, preserve with approved chemicals, protect from freezing; follow the IOM precisely.

Author: STARK Water Engineering Team · Updated: 2025-09-17

게시물을 공유하세요: