Don’t Let the “Holiday Pause” Disrupt Your Q1 Momentum

Table of Contents

CNY 2026 Supply Chain Notice
Urgent Supply Chain Notice: CNY 2026

To Our Valued Partners:
The Chinese New Year (Lunar New Year) is approaching in February. During this period, raw material supply chains and logistics networks across Asia will pause operations.

📦 Orders Placed Before February
Priority Production & Shipping
During February
Production & Logistics Paused
Orders Placed Late
Scheduled for March Delivery

*To guarantee your Q1 inventory, we strongly recommend finalizing your purchase orders immediately.

In the world of international trade, timing is everything. As we move through January, businesses worldwide are ramping up their operations for a strong start to 2026. However, there is a critical event on the horizon that every procurement manager must account for: The Lunar New Year (CNY).

At Stark Water, we pride ourselves on speed and reliability. But the reality of manufacturing in Asia is that this holiday represents a complete pause in the industrial ecosystem. It is not just our factory that closes; it is the raw material suppliers, the trucking companies, and the port authorities.

To ensure your projects—whether they involve complex Water Treatment Plants or essential Spare Parts—stay on schedule, proactive planning is essential.

Why “Waiting Until February” is Too Late

A common misconception is that production stops only during the holiday week. In reality, the industrial slowdown begins much earlier and extends much later. Here is what the timeline actually looks like for your order:

  • 1. The Raw Material Freeze (Late Jan):
    Before we can weld a Stainless Steel Tank or assemble a skid, we need materials. Steel mills and resin suppliers often stop operations weeks before the holiday to perform maintenance. If we don’t lock in your materials now, we cannot start production.
  • 2. The Logistics Crunch (Early Feb):
    Domestic logistics (trucking) is the first link to break. Drivers head home for family reunions early. Even if your goods are finished, without trucks, they cannot reach the port.
  • 3. The “March Bottleneck” (Post-Holiday):
    When factories reopen in March, there is a massive surge of backlog orders from all over the world. New orders placed in February often get pushed to the back of the queue, resulting in lead times stretching into April.

The Strategic Advantage of Ordering Now

This is not just about avoiding delays; it is about securing a competitive advantage for your business in Q1.

✅ Priority Shipping Slots

Ocean freight space becomes incredibly tight right before the holiday. Orders confirmed now secure container space before rates spike.

✅ Price Stability

Raw material prices often fluctuate post-holiday. Locking in your order now guarantees your pricing structure.

✅ Continuous Inventory

Ensure you have ample stock of consumables (membranes, filters) to last through March, keeping your clients happy.

How We Are Preparing to Support You

Stark Water is currently running at full capacity. We have optimized our production lines to clear as many shipments as possible before the break.

  • For Standard Accessories: We are prioritizing “Fast-Track” shipping for in-stock items.
  • For Custom Projects: Our engineering team is working overtime to finalize drawings so materials can be secured immediately upon your deposit.

Our goal is simple: To ensure your business feels ZERO impact from the holiday pause.

Beat the Rush. Secure Your Production Slot.

Don’t wait until the logistics network pauses. Contact our team today to confirm your Q1 requirements and ensure a smooth delivery timeline.

Secure Your Slot Now →

Priority handling for orders confirmed this week.

Share the Post:
Preferred products
滚动至顶部