Catégorie : Water Treatment Accessories
Industrial water-treatment accessories for RO/UF/EDI systems. In-stock spares, engineering-backed sizing, and compliant materials—built for OEMs, EPCs, and maintenance teams.
Engineering-First Sizing
24-hour selection support with drawings/BOM review for RO/UF/EDI retrofits.
Matériaux certifiés
ISO 9001 process, SS304/316L & FRP vessels, material/pressure test docs on request.
Project-Proven
Installed in municipal, food & beverage, energy, and desalination projects worldwide.
Exécution à l'échelle mondiale
Stock for fast movers, 5–15 day build for OEM kits, export-ready packing.
OEM & Private Label
Custom labeling, documentation bundles (datasheet, MSDS, IQ/OQ templates) available.
Lifecycle Support
Spares planning, warranty terms, and preventive-maintenance checklists included.
-
Réservoir de filtration FRP
10T GRP Tank Ion Exchange Resin Salt Carbon Filter FRP TANK Water Softener system
Ajouter au devis -
Accessoires pour le traitement de l'eau
Filtre PP 5 microns 20 pouces (sédiment soufflé par fusion) | STARK
Ajouter au devis -
Réservoir de filtration FRP
Best Price FRP Tank Ion Exchange Resin Salt Tank 1054 FRP TANK Water Softener system
Ajouter au devis
Guide de sélection des accessoires de traitement de l'eau
- Flow & duty: average/peak flow (m³/h), run hours, single/parallel lines
- Water data: TDS, SDI/turbidity, temperature, pH, key ions/metals, UVT (for UV)
- Mechanical: piping size & standard (NPT/BSP/flange), layout, available footprint
- Conformité : required certificates (material/pressure/NSF/CE), document bundle
- Utilities: power spec, ambient constraints
- Replacement strategy: target change-out ΔP / UV lamp hours / resin capacity
Tip — Use the left CTA to send a water report and P&ID/photos; we reply within 24h with sizing and alternates.
- Choix rapide : 4040 for ≤2–3 m³/h and compact skids; 8040 for ≥4 m³/h mains; UF upstream for high turbidity/organics.
- Les étapes :
- Set targets (rejection/retention, permeate flow, recovery) and feed limits (SDI≤5, temp, residual chlorine=0).
- Decide elements per vessel & stages (typical per-element flux depends on temp/fouling).
- Check TMP, end-of-run ΔP, and CIP chemistry compatibility (keep 10–20% margin).
- Compatibility checklist: 4040 vs 8040, spacer thickness/pressure drop when mixing brands, backpressure limits.
- Common pitfalls: no dechlorination; high recovery with poor SDI; ignoring temperature correction for flux.
Type | Typical target | Notes |
---|---|---|
RO | 95–99.5% salt rejection | Recovery 45–75% with antiscalant strategy |
NF | Hardness/organics selective retention | Lower pressure; partial divalent retention |
UF | Turbidity/colloids/macromolecules | Improve SDI to ≤3–4 for RO |
Système | Capacité par train | Récupération | Énergie (typ.) | Sortie |
---|---|---|---|---|
OI saumâtre | 1-60 m³/h | 65-85% | 0,7-1,5 kWh/m³ | 10-200 µS/cm |
Eau de mer RO | 1-50 m³/h | 35-50% | 3,5-5,0 kWh/m³ | 300-700 µS/cm |
Prétraitement UF | 1-100 m³/h | - | - | SDI ≤ 3 @15 min |
Polissage EDI | 0,5-30 m³/h | - | - | ≤ 0,5 µS/cm |
- Choix rapide : Corrosive/high-temp → SS316L; standard desalination → FRP (lightweight, corrosion-proof).
- Les étapes :
- Entry type: end vs side—match skid piping orientation.
- Pressure class: brackish 300–450 psi; seawater/high-pressure 600–1000+ psi.
- Connexions : NPT/BSP/flange; brackets/clamps; end-cap style and O-ring spec.
- Checklist: element length & count, vent/drain ports, hygienic vs industrial grade.
- Les pièges : no allowance for insulation/thermal expansion; wrong port orientation; no pull-out space for elements.
Spec | Typical |
---|---|
4040 | 1 element/vessel; ≤25 bar |
8040 | 1–7 elements/vessel; ≤41 bar (brackish) |
- Choix rapide : Pre-RO: 5–20 µm; polishing: 1–5 µm; absolute-rated for critical steps.
- Les étapes :
- Size & caps: 10/20/30/40″, DOE/SOE (222/226); media PP/PES/PTFE per chemistry.
- Efficiency: Absolute (β≥5000) vs nominal; match particle target & downstream sensitivity.
- Flow/ΔP: rough rule 10″ 5–20 L/min; change-out ΔP 0.8–1.5 bar.
- Checklist: housing length/guide, gasket (EPDM/Viton/PTFE), sanitation method (thermal/chemical).
- Les pièges : over-fine rating → frequent clogging; no staged filtration; wrong basket for bag filters.
Micron | Use case |
---|---|
20–50 µm | Coarse protection after sand filter |
5–10 µm | Typical RO pre-filter |
1–5 µm | Polishing / sensitive steps |
- Choix rapide : FRP for most corrosive/ambient duties; steel for high temp/pressure and large flanged nozzles.
- Media filters:
- Surface loading (filtration rate): 5–10 m³/h·m² depending on water quality.
- Backwash intensity: sand 12–18 L/m²·s, GAC 8–15 L/m²·s (30–40% bed expansion).
- Fittings: top vs side mount, laterals/distributors, sight-glass/drain/manway.
- Softeners:
- Resin volume = treated load ÷ working capacity; regeneration by time/flow.
- Common salt dose: 6–10 lb/ft³ balancing efficiency and leakage.
- Les pièges : insufficient backwash → bed fouling; wrong liner/coating in steel; undersized control valve.
- Choix rapide : Small flow/chemical duty → solenoid diaphragm; higher flow/backpressure → mechanical diaphragm.
- Quick formula:Required flow (L/h) = Target dose (mg/L) × Water flow (m³/h) ÷ Solution concentration (%)
Example: 3 mg/L NaOCl, 10 m³/h, 10% solution ⇒ 3×10 ÷ 10 = 3 L/h (×1.2 safety margin).
- Checklist: backpressure (bar), stroke range, wetted materials (PTFE/EPDM/FKM), anti-siphon/back-pressure valves, pulsation dampener.
- Les pièges : low backpressure → siphoning/overfeed; viscosity change with temp/concentration ignored.
- Choix rapide : Post-RO polishing: 30–40 mJ/cm² (higher for critical applications).
- Les étapes :
- Confirm UVT @254 nm and dose setpoint.
- Select chamber (stainless steel), sensors/alarms, and validation method.
- Prefilter to ≤5 µm; plan sleeve cleaning and lamp change intervals.
- Les pièges : ignoring UVT swings; no bypass for maintenance; no lamp-life tracking.
- Choix rapide : Manual vs automatic (time/flow/ΔP triggers) per process criticality.
- Checklist: thread standard (NPT/BSP) or flange, seal materials (EPDM/FKM/PTFE), Cv/pressure drop, temp/pressure rating.
- Les pièges : thread standard mismatch; incompatible elastomers; undersized regeneration flow.
FAQ
Pouvez-vous confirmer la compatibilité avec mes boîtiers/ports existants ?
Do you provide compliance documents (NSF/CE/material/pressure tests)?
Available for selected items; sample files and a checklist can be shared before ordering.
Quels sont les délais de livraison habituels ?
Stock items: 3–5 days. OEM kits: 5–15 working days depending on QC and labeling.
Do you support OEM/private label and spare-stock planning?
Yes—custom labels, datasheets, and buffer-stock programs with warranty and NDA.
How do I get engineering help?
Use the left CTA to WhatsApp/Email. Share water analysis and P&ID—we’ll size and quote.