Category: Stainless steel separation equipment
Industrial stainless-steel products for water & process systems—tanks, filter housings, vessels, fittings & skids. Hygienic design, certified materials, and engineering-backed fabrication for OEMs and EPC projects.
Certified Materials
SS304/316L (duplex on request), traceable MTRs and pressure-test reports.
Hygienic & Industrial Finishes
Internal pickling/passivation, sanitary polish options, weld grinding on demand.
Engineering-First Fabrication
TIG welding, nozzle schedule & GA drawings; 24-hour drawing/BOM review.
Pressure & Compliance
Hydrostatic testing, gasket & O-ring specs, global export documentation.
Custom & OEM
Custom dimensions, jackets/insulation, manways, tri-clamp or flanged ports.
Global Fulfillment
Crated export packing; 5–15 working days for typical builds; on-time shipments.
Water Treatment Accessories Selection Guide
- Service & duty: medium, temperature, design pressure, continuous/Batch
- Flow/volume: m³/h and required retention time (for tanks/filters)
- Connections: tri-clamp / NPT / BSP / flange (DIN/ANSI), nozzle sizes & orientation
- Finish & hygiene: internal Ra target, passivation, weld treatment
- Compliance: material certs (e.g., EN10204 3.1), pressure test, documentation bundle
- Quick pick: 316L for chlorides/food-grade; add PU/rock-wool insulation & jacket for hot/cold service.
- Steps:
- Volume & geometry: set working volume + headspace; choose vertical/horizontal per footprint.
- Nozzles & access: inlet/outlet/drain/vent, CIP/SPRAY ball, manway, level/pressure ports.
- Construction: internal finish (pickled/passivated or polished), baffles/legs/skirts; lifting lugs.
- Pitfalls: undersized vents (vacuum collapse), no drain slope, wrong gasket vs temperature.
- Quick pick: Filtration rate 5–10 m³/h·m²; backwash intensity to 30–40% bed expansion.
- Steps:
- Select vessel diameter/height to hit rate; add sight-glass, manway & differential-pressure ports.
- Choose internals: header-lateral or nozzle plates; define media grade & depth.
- Pitfalls: insufficient backwash → bed fouling; forgetting lined/coated steel if not using SS.
- Quick pick: Multi-round for higher flows; DOE/SOE (222/226) per element; tri-clamp sanitary or flanged.
- Steps:
- Decide cartridges count (e.g., 3/5/7/12-round) & length (10/20/30/40″).
- Set design ΔP & change-out; plan vent & drain; add legs and swing-bolt cover if needed.
- Pitfalls: mixing nominal/absolute elements; no basket sizing for bag housings; wrong seal (EPDM/FKM/PTFE).
- Quick pick: End-port vs side-port per skid layout; 4040 for compact lines, 8040 for mains.
- Steps:
- Confirm pressure class (e.g., 300–450 psi brackish; higher for seawater), clamp type & O-ring spec.
- Allow pull-out space for elements; plan supports/brackets and insulation if hot lines.
- Pitfalls: wrong port orientation; missing vent/drain; no allowance for thermal expansion.
- Quick pick: Anchor/paddle for high-viscosity; propeller/turbine for water-like fluids. Jacket & coil available.
- Steps:
- Set working volume & retention; choose agitation power (tip speed / Reynolds regime).
- Add baffles, shaft seal type, gearmotor mount; plan CIP & sanitary drains.
- Pitfalls: no baffles (vortexing); undersized motor; no clean-in-place access.
- Quick pick: Tri-clamp for sanitary modules; flanged for industrial; include support frames & drip-trays.
- Steps:
- Lock thread standard (NPT/BSP) and gasket material; specify polish on wetted paths if required.
- Add rail-mounted valves, instrument ports, and lifting eyes for handling.
- Pitfalls: thread mismatch; mixed elastomers; no alignment features on long manifolds.
FAQ
What finish options are available?
Pickled/passivated internal by default; sanitary polish (Ra targets) on request. Welds can be ground & blended where specified.
Do you provide certificates and pressure tests?
Yes—material certificates (e.g., EN10204 3.1 when available) and hydrostatic test reports can be issued per order.
Can you add jackets, insulation, or manways?
Yes—single/double jacket, PU/rock-wool insulation, top/side manways, spray balls, and CIP ports are available.
Typical lead times?
Standard housings and small tanks: 5–10 working days. Custom vessels/skids: 10–20 working days depending on QA and documents.
How do I get engineering support?
Use the left CTA to WhatsApp/Email. Share service conditions, P&ID, and layout → we return drawings and a quote within 24h.