Ofrecerle una solución profesional

Categoría: Stainless steel separation equipment

Industrial stainless-steel products for water & process systems—tanks, filter housings, vessels, fittings & skids. Hygienic design, certified materials, and engineering-backed fabrication for OEMs and EPC projects.

Certified Materials

SS304/316L (duplex on request), traceable MTRs and pressure-test reports.

Hygienic & Industrial Finishes

Internal pickling/passivation, sanitary polish options, weld grinding on demand.

Engineering-First Fabrication

TIG welding, nozzle schedule & GA drawings; 24-hour drawing/BOM review.

Pressure & Compliance

Hydrostatic testing, gasket & O-ring specs, global export documentation.

Custom & OEM

Custom dimensions, jackets/insulation, manways, tri-clamp or flanged ports.

Global Fulfillment

Crated export packing; 5–15 working days for typical builds; on-time shipments.

Water Treatment Accessories Selection Guide

  • Service & duty: medium, temperature, design pressure, continuous/Batch
  • Flow/volume: m³/h and required retention time (for tanks/filters)
  • Connections: tri-clamp / NPT / BSP / flange (DIN/ANSI), nozzle sizes & orientation
  • Finish & hygiene: internal Ra target, passivation, weld treatment
  • Compliance: material certs (e.g., EN10204 3.1), pressure test, documentation bundle
  1. Quick pick: 316L for chlorides/food-grade; add PU/rock-wool insulation & jacket for hot/cold service. 
  2. Steps:
    • Volume & geometry: set working volume + headspace; choose vertical/horizontal per footprint. 
    • Nozzles & access: inlet/outlet/drain/vent, CIP/SPRAY ball, manway, level/pressure ports.
    • Construction: internal finish (pickled/passivated or polished), baffles/legs/skirts; lifting lugs.
  3. Pitfalls: undersized vents (vacuum collapse), no drain slope, wrong gasket vs temperature.
  1. Quick pick: Filtration rate 5–10 m³/h·m²; backwash intensity to 30–40% bed expansion. 
  2. Steps:
    • Select vessel diameter/height to hit rate; add sight-glass, manway & differential-pressure ports.
    • Choose internals: header-lateral or nozzle plates; define media grade & depth.
  3. Pitfalls: insufficient backwash → bed fouling; forgetting lined/coated steel if not using SS.
  1. Quick pick: Multi-round for higher flows; DOE/SOE (222/226) per element; tri-clamp sanitary or flanged. 
  2. Steps:
    • Decide cartridges count (e.g., 3/5/7/12-round) & length (10/20/30/40″).
    • Set design ΔP & change-out; plan vent & drain; add legs and swing-bolt cover if needed.
  3. Pitfalls: mixing nominal/absolute elements; no basket sizing for bag housings; wrong seal (EPDM/FKM/PTFE).

  1. Quick pick: End-port vs side-port per skid layout; 4040 for compact lines, 8040 for mains. 
  2. Steps:
    • Confirm pressure class (e.g., 300–450 psi brackish; higher for seawater), clamp type & O-ring spec.
    • Allow pull-out space for elements; plan supports/brackets and insulation if hot lines.
  3. Pitfalls: wrong port orientation; missing vent/drain; no allowance for thermal expansion.
  1. Quick pick: Anchor/paddle for high-viscosity; propeller/turbine for water-like fluids. Jacket & coil available. 
  2. Steps:
    • Set working volume & retention; choose agitation power (tip speed / Reynolds regime).
    • Add baffles, shaft seal type, gearmotor mount; plan CIP & sanitary drains.
  3. Pitfalls: no baffles (vortexing); undersized motor; no clean-in-place access.
  1. Quick pick: Tri-clamp for sanitary modules; flanged for industrial; include support frames & drip-trays. 
  2. Steps:
    • Lock thread standard (NPT/BSP) and gasket material; specify polish on wetted paths if required.
    • Add rail-mounted valves, instrument ports, and lifting eyes for handling.
  3. Pitfalls: thread mismatch; mixed elastomers; no alignment features on long manifolds.

PREGUNTAS FRECUENTES

What finish options are available?

Pickled/passivated internal by default; sanitary polish (Ra targets) on request. Welds can be ground & blended where specified.

Yes—material certificates (e.g., EN10204 3.1 when available) and hydrostatic test reports can be issued per order.

 

Yes—single/double jacket, PU/rock-wool insulation, top/side manways, spray balls, and CIP ports are available.

 

Standard housings and small tanks: 5–10 working days. Custom vessels/skids: 10–20 working days depending on QA and documents.

Use the left CTA to WhatsApp/Email. Share service conditions, P&ID, and layout → we return drawings and a quote within 24h.

Scroll al inicio